Process
Four steps.No mystery.
From first call to a report you can act on, in two working days.
Process
From enquiry to action.
01
Get in touch
Tell us the building and the number of doors.
02
Surveyor attends
Including evenings and weekends.
03
Report within 48 hours
Photographic evidence, door by door.
04
Take action
Prioritised remedial work, clearly ordered.
On site
What happens during the survey.
- 01Door reference and location recorded
- 02Assembly checked as a whole
- 03Gap and seal measurements taken
- 04FD rating evidence noted
- 05Photographs captured against each door
Fire door inspection
Door schedule
- FD-01Ground floor lobbyPASS
- FD-02Stair core / level 1REMEDIAL
- FD-03Service riser / level 1PASS
- FD-04Corridor cross doorFAIL
- FD-05Plant room accessPASS
Door-by-door schedule
Photographic evidence
Gap & seal measurements
FD rating checks
Prioritised remedial actions
Pass / remedial / fail status

After the report
Prioritised actions, ordered by risk.
Every door is marked pass, remedial or fail, so remedial work can be directed without re-reading the whole document.
Need your fire doorsinspected?
Tell us the building and number of doors. We'll come back with availability and a fixed price.
David@prontosurveys.co.uk