Sector 05
Hotels &hospitality
Guest bedroom and corridor doors, surveyed without disturbing guests.

Overview
Hotels rely on bedroom doors performing exactly as designed.
Inspections are timed around occupancy so rooms are surveyed without affecting the guest experience.
Key considerations
Guest bedroom doors
Every room door assessed as a complete assembly including self-closing performance.
Corridors and escape routes
Protected corridor and stair doors documented along the full route.
Occupancy-led scheduling
Floor-by-floor surveys arranged around housekeeping and bookings.
Back of house
Kitchen, plant and service doors included in the same schedule.
What is inspected
The completedoor assembly.
Leaf, frame and alignment
Gaps and clearances
Intumescent and smoke seals
Hinges and ironmongery
Self-closing performance
Glazing and apertures
Signage and certification evidence
Your report, delivered within two working days of the survey.
- Door-by-door schedule
- Photographic evidence
- Gap & seal measurements
- FD rating checks
- Prioritised remedial actions
- Pass / remedial / fail status
Need your fire doorsinspected?
Tell us the building and number of doors. We'll come back with availability and a fixed price.
David@prontosurveys.co.uk